The length of the transmission lines remains unchanged, i.e.:
- LT01 500kV UHEBM – SE Xingu: 13.2 km
- LT02 500kV UHEBM – SE Xingu: 13.2 km
- LT03 500kV UHEBM – SE Xingu: 13.0 km
- LT04 500kV UHEBM – SE Xingu: 12.9 km
- LT05 500kV UHEBM – SE Xingu: 12.8 km
- LT01 69kV UHEPI – UHEBM: 61.0 km
- LT01 230kV UHEPI – SE Altamira: 61.0 km.